HIFULL Product Advisor

ApplicationDetail & SystemFunctionHIFULL Fumed Silica Suggest
Silicone RubberHTV/LSRReinforce & TransparencyHL-200/HL-300/HL-380
HB-132
INSULATORReinforce & InsulateHL-150/HL-200
HB-139
RTVThickening & Thixotropic
Sag-resistance & Reinforce
Transparency & Insulate
HL-150/HL-200
HIFULL Hydrophobic Grades
Composite Materials/ ResinsUPR-low polarityThickening, Thixotropic, Sag-resistance, Settling-resistanceHL-200/HL-300
Gel coat resin-Medium polarityHL-200
HB-151/HB-152
Vinyl & Epoxy Resin-Hign polarityHB-139
HB-630/HB-135
CoatingsPowder Coatingscorona electrificationFree flow, smooth surface, enable stability even at low dosage, improve transport efficiencyHB-630/HB-151/HL-200/HL-300/HL-380
VarnishPolyurethane, Acrylic, Epoxy-Polyester, AminoGloss-intensity, rheology control, sag-resistance, leveling, scratch-resistance,HB-630/HB-151/HL-200/HL-300
Liquid
Coatings
solvent based or high solids coatingSag-resistance, Settling-resistance,
leveling
HL-200/HL-300/HL-380/HB-139
Acrylic, polyester, Nitrorheology control,
Sag-resistance,
Settling-resistance
HL-200/HL-300
Epoxy, vinyl polyester, polyurethanerheology control,
Sag-resistance,
Settling-resistance
HB-151/HB-139
Multicolor paintAnti-corrosionHB-630/HB-151/HB-139/HL-200/HL-300/HL-380
Industrial Paint & Marine CoatingsAnti-corrosion,
moisture resistance
HB-139/HB-151/HB-630
Printing InkLetterpress Pringtingrheology control,
suspension,
clarity improve,
pigment disperse
HL-200/HB-151
Flexographic PrintingHL-200/HB-151
Offset PringtingHL-200/HL-300/HB-151
Screen PrintingHL-200/HL-300/ HL-380
Gravure PrintingHL-200/HB-151
AdhesivesEpoxy Adhesivesag-resistance,
settling-resistance
HB-139/HB-151/ HL-200/HL-300
Polyurethane Adhesivesag-resistance,
rheology control,
thixotropic,
viscosity increase
HB-139/HB-151/ HL-200/HL-300
Acrylic,
cyan acrylic, Anaerobic acrylic, UV-cured acrylic adhesives
settling-resistance,
rheology control,
thixotropic
HB-139/HB-151/ HL-200/HL-300
Organic silicone adhesivesreinforce,
rheology control
HL-150/HL-200/ HB-132/HB-630/ HB-620/HB-612/ HB-615
MS/SMP/SPU adhesivessag-resistance,
rheology control,
thixotropic,
viscidity increase
HL-200/HB-151/ HB-139
Rubber-based adhesives (BR /CR /NR)rheology control,
thixotropic,
reinforce
HL-200/HB-151/
Pressure sensitive adhesivesviscidity increase
rheology control,
thixotropic
HL-200
SealantsPolyurethane Sealantssag-resistance,
thixotropic,
extrusion efficiency,
stability( moisture control)
HB-139/HB-151/ HL-200
Acrylic Sealantssag-resistance,
settling-resistance, rheology control,
thixotropic,
extrusion efficiency
HB-151/ HL-200
Organic siliconesag-resistance, reinforce,
rheology control,
thixotropic,
extrusion efficiency,
stability( moisture control)
HL-150/HL-200/ HB-132/HB-630/ HB-620/HB-612/ HB-615
MS/SMP/SPU sealantsreinforce,
extrusion efficiency,
stability( moisture control)
HB-139/HB-151
butyl rubber-based sealantssag-resistance,
reinforce
HL-200/ HB-151
Polysulfide sealantReinforce,
rheology control,
thixotropic,
HL-200/ HB-151/ HB-139
Other Applications Printing TonerFree-flow aid, anti-caking,
water-repellent,
charge control
HB-630/HB-151/HB-139/
HB -612/HB-615
PharameticualsSolid or powder –free-flow aid, anti-caking, hydrophilicity
Liquid – thickening, anti-settling
HL-200
Personal CareLiquid – thickening, thixotropic, anti-settling, lotion stability;
Solid or powder-free flow aid, prill agent
HL-200/HL-300
HB-139
Gel BatteryThickening, thixotropic, reduce acid mist, extend battery lifeHL-200

Детали упаковки и доставки

Количество (килограммы)1 – 500>500
Est. Время (дни)10Подлежит обсуждению

Полная Загрузка Контейнера

Гидрофильный Пирогенного Кремнезема

20футов: 1.8 тонны (180kg/поддон, всего 10 поддонов)  

40HQ: 4.2 тонны (200kg/поддон, всего 10 поддон + 20 сыпучих мешков)

Полная Загрузка Контейнера

Гидрофильный Пирогенного Кремнезема HB-139& HB-151

20FT: 2.2 тонны (220kg/поддон, всего 10 поддон)

40HQ: 4.8 тонны (240kg/поддон, всего 20 поддон)

Упаковка

Многослойный пакет из крафт-бумаги, 10 kg/поддон

Delivery date

Обычно доставка до китайского порта занимает от 7 до 10 дней после получения первоначального взноса. В случае задержки из-за изменения графика производства, отгрузки и /или по любым другим причинам, пожалуйста, проконсультируйтесь с продавцом перед отправкой.

Port

Порт Гуанчжоу, порт Шанхай или любые другие доступные порты в Китае по согласованию.